The Impact of Change Orders on Cost and Schedule Performance of Highway and Bridge Construction Projects: Empirical Evidence from Egypt's National Road Network.
Abstract
Change orders remain one of the most persistent sources of cost and schedule growth in highway and bridge construction, yet empirical, project-level evidence from national road agencies in the Middle East and North Africa (MENA) region remains scarce. This study quantifies the impact of change orders on the cost and duration performance of 50 major highway, bridge, and urban-axis projects implemented under Egypt's national roads and bridges program. Project-level records were compiled and analyzed using descriptive statistics, Pearson correlation, independent-samples t-tests, and simple linear regression. The results show that change orders increased contract costs by a mean of 24.48% (SD = 6.65%; weighted mean = 23.83% across a portfolio value of EGP 381.0 billion) and extended implementation duration by a mean of 17.54% (SD = 4.23%; weighted mean = 16.97%). Cost growth and schedule growth were positively and significantly correlated (r = 0.566, p < .001), and did not differ significantly between completed and ongoing projects (p > .05), indicating that change-order impacts are established early in project delivery and persist through completion. Scope-change and lane-widening orders were the most frequent trigger (36% of cases) and, together with service-facility additions, produced the largest average cost impact. These findings are substantially larger than change-order growth rates reported for mature-market highway programs (approximately 5-7%), pointing to weaker front-end planning and design maturity as key drivers. The study contributes an empirical benchmark for change-order risk in large-scale Egyptian infrastructure and offers actionable recommendations for contingency budgeting, front-end planning, and change-order governance for road authorities operating in similarly fast-track infrastructure programs.