Integrate Fast Tracking Techniques with the Critical Path Method (CPM) to Accelerate Project Timelines

Authors

  • Rehab Raheem Kadhim, Mushtak A.K. Shiker

Keywords:

Residential complex projects, Critical path method (CPM), Project scheduling, Fast-tracking.

Abstract

Project fast-tracking involves executing project activities sequentially and in parallel, accelerating completion time. In this research, the Critical Path Method (CPM) was used to analyze and schedule a residential complex construction project through systematic analysis of project tasks and identification of critical paths, which enables project managers to optimize project schedules and compress the schedule effectively. Fast-tracking also enables simultaneous tasks and overlapping sequential activities, thus helping compress project timelines without compromising on quality, ultimately accelerating project timelines.

Published

2024-09-23

How to Cite

Rehab Raheem Kadhim, Mushtak A.K. Shiker. (2024). Integrate Fast Tracking Techniques with the Critical Path Method (CPM) to Accelerate Project Timelines . The International Journal of Multiphysics, 18(3), 1154 - 1159. Retrieved from https://themultiphysicsjournal.com/index.php/ijm/article/view/1413

Issue

Section

Articles