Samira Karimi Sefiddashti (2024) “Designing An Integrated Scheduling Model for Production and Maintenance and Repairs in an Open Workshop Production System in Stable Conditions”, The International Journal of Multiphysics, 18(4), pp. 1191 - 1214. Available at: https://themultiphysicsjournal.com/index.php/ijm/article/view/1858 (Accessed: 5October2025).