[1]
Samira Karimi Sefiddashti 2024. Designing An Integrated Scheduling Model for Production and Maintenance and Repairs in an Open Workshop Production System in Stable Conditions. The International Journal of Multiphysics. 18, 4 (Dec. 2024), 1191 - 1214.